Framing Continues


These show scenes of Oct. 3rd.

  Here's the view from across the street where the green area is.  You can see that our driveway will be right next to the street light.  This is going to be a challenge if we have to back down the driveway.  And, I've been quite surprised by the amount of traffic that goes by the house.  But, its really not enough to bother us.  And, the communicty pool it just down the street - to the left (from this view) about two blocks.

The following are from October 10, 1999.  Not as much progress as we had hoped for.


The forms are off the slab.  Notice how high above the ground the slab is at this point


Always looking for new shots, this is one from the back door.  You can see the patio in the foreground, the fence and on a post is the construction electric service.
This is looking towards the West from the East fence at the bck of the lot.  The concrete thing just a little above the middle of the picture is a drain into the retention pond that is in the ditch at the right.  In the extreme background is a sewage treatment plant.  I don't know if its for our sewage or not.